04.1 / Case study / LPP

200+ locations. Three markets. One standard.

A multi-brand retail rollout programme delivered across Bulgaria, Italy and Greece since 2021.

200+Locations
15+Monthly store capacity
3Installation teams
30Typical days from assignment

From assignment to installed location.

VITAL receives the site scope, adapts technical documentation, manufactures the required brand elements, prepares site-specific packages and completes installation.

From assignment to installed location.

Consistency across different buildings and markets.

Every location has different dimensions, facade conditions and site constraints. The brand result must remain recognisable and consistent regardless of those differences.

A connected delivery chain.

01

Technical preparation

Site adaptation and production documentation.

02

Manufacturing

Logos, illuminated elements, facades and structures.

03

Quality & packing

Checks and site-specific preparation before dispatch.

04

Logistics & installation

Coordinated delivery and field completion.

A rollout system proven at scale.

More than 200 locations delivered across three European markets. Monthly capacity of 15+ stores, with three installation teams able to work in parallel.

Have a programme to deliver?

Start a project↗